Knauf Wall Lining Systems
Weiter
Wall Lining Systems
-
System
|
Description
|
Download
|
W611
|
W611 Gypsum Board Drywall Lining System is installed by applying single layer Knauf Gypsum Board with minimum thickness 9,5mm on the existing walls with Yapıgips gypsum based adhesive.
|
Data Sheet
|
W624
|
W624 drywall lining system is installed with applying layer 12,5 mm Gypsum Board which is laminated with 20/30/50 mm mineral wool, on the existing walls by using Yapıgips adhesive in order to increase the thermal insulation values of the existing walls.
|
Data Sheet
|
W631
|
W631 drywall lining system is installed with applying single layer 9,5/12,5 mm Gypsum Board which is laminated with 20/30/40 mm EPS, on the existing walls by using Yapıgips adhesive in order to increase the thermal insulation values of the existing walls.
|
Data Sheet
|
System
|
Description
|
Download
|
W623
|
W623 Gypsum Board Drywall Lining System is installed on the existing wall with direct hanger, Ceiling C and U channels with single or double layer 12,5 mm Gypsum Board and in between mineral wool in order to fulfill the sound and thermal insulation requirements.
|
Data Sheet
|
W623A Aquapanel
|
W623A Aquapanel® Drywall Lining System is installed on the existing wall with direct hanger, Ceiling C channel and Ceiling U channel with 12,5 mm single layer Aquapanel® and in between mineral wool in order to fulfill the sound and thermal insulation requirements.
|
Data Sheet
|
W623C Cleaneo
|
W623C Cleaneo Drywall Lining System is installed on the existing wall with direct hanger, Ceiling C channel and Ceiling U channel with single layer Cleaneo according to the required area and single layer 12,5 mm Knauf Gypsum Board (double layer where Cleaneo is not applied) and in between mineral wool in order to fulfill the optimum sound absorption requirements.
|
Data Sheet
|
System
|
Description
|
Download
|
W625
|
W625 Gypsum Board Drywall Lining System is installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm single layer Knauf Gypsum Board and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.
|
Data Sheet
|
W626
|
W626 Gypsum Board Drywall Lining System is installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm double layer Gypsum Board and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.
|
Data Sheet
|
W625A Aquapanel
|
W625A Aquapanel® Wall Cladding System is installed with DC stud and DU channel which are located separate from the wall and with 12,5 mm single layer Knauf Aquapanel® and in between mineral wool for fulfilling thermal insulation and fire resistance requirements.
|
Data Sheet
|
W629C Cleaneo
|
W629C Cleaneo Drywall Lining System is installed with DC stud fixed from the back sides and DU channel which are located separate from the wall and with single layer Cleaneo according to the required area and single layer 12,5 mm Gypsum Board (Double layer where Cleaneo is not applied) and in between mineral wool in order to fulfill the optimum sound absorption requirements.
|
Data Sheet
|